H&S Notification - as submitted for project

SP15-04227 Nescot College Survey Report 1-signed.pdf

Site Specific Asbestos Survey

June 2015

Inspection Report.pdf

Building Control - Inspection Report

NOT COMPLETION

COMMISSIONING AND AS BUILT INFORMATION


Air Con Supply.pdf

Air Conditioning Supply

Beauty Salon.pdf

Beauty Salon

Drawing 1.pdf

Drawing 1 - Rooms E131, 132,133

Drawing 2.pdf

Drawing 2 - Room E128 A + B

Drawing 3.pdf

Drawing 3 - Rooms W151, 153, 154

Vapa Building.pdf

Vapa Building

HSPlan-Classroom refurbishment and alterations - Nescot.pdf

Construction Phase H&S File

As approved

Drawings and Documents


D5357B PAGE 3 OF 3.pdf TREVOR BLAKE NESCOT COLLEGE DEMO RAMS.pdf

Demolition Contractor (Approved)

Risk assessment and methodology

Room W151, 153, 154




Furniture

Layout




Room W151  W153  W154.pdf

Ceiling

Layout




D5357B PAGE 1 OF 3.pdf

Room E131, 132, 133



Furniture

Layout




Room E131  E132  E133.pdf

Ceiling

Layout




D5357B PAGE 2 OF 3.pdf

Room E128 A+B


Furniture

Layout




119 a building reg notes.pdf

Ceiling

Layout




Room N203

Room N203.pdf

Ceiling

Layout




Room N205

Room N205.pdf

Ceiling

Layout




Crane - Air Con Equipment lift

Risk Assessments



Methodology




Crane details

Risk Assessments.pdf Method Statement.pdf 3692 TB Nescott.pdf 1B4830AS - Plan Assessment.pdf

Building Control - Comment

119 a building reg notes.pdf

Amended plan with building notes

Note the information below was used during the  construction phase of this project.

NESCOT - HEALTH & SAFETY FILE

REFURBISHMENT PROJECT UNDERTAKEN BY TREVOR BLAKE LTD SUMMER 2015

NESCOT - HEALTH & SAFETY FILE

The client is advised to make electronic copies of the above information. A single memory stick will be given to the client upon completion of the above information. This web page will be maintained for a nominal period of one year.